Projects Under Construction
Swimming Pool Rehabilitation
Project includes rehabilitation of the main pool, demolition of the small pool, and improvement to various items within pool area. Contractor has completed a majority of concrete placement for the decking and sidewalk for the pool area. Contractor has begun the installation of the diving board and has begun work on the drainage system around the pool.
Arborist has completed rehabilitation work on trees surrounding the pool that were impacted by construction.
Board has approved Change Order No. 3 for the auto chlorination system only and has requested that a separate change order is produced for the deduction of the shade structure. Board has also approved Pay Request No. 4 for $77,850.00.
The District understands that the Contractor is behind schedule and is using every effort to expedite completion of the rehabilitation. The District appreciates the public’s patience as we ensure the project is completed correctly and it will be a project the community can be proud to use.
Programming Updates for the Surface Water Treatment Plant
Engineer is coordinating with Operator to compile a list of systems that are compatible, user friendly, and have operational ability with the existing units. Once a list is obtained, Engineer will coordinate a site meeting with the Contractor to ensure new SCADA system is fully operational.
Belt Press Upgrades at Surface Water Treatment Plant
Project includes upgrading the belt press at the surface water treatment plant to allow for consistent operation and reduce the overall run time of the process. The startup was successful and the belt press is fully operational. Board approved Change Order No.1 as a deduction to the contract of $26,390.00 for a final contract amount of $734,610.00.
Wastewater Treatment Electrical Improvements & Generator Replacement
Project includes update of the control panel and related electrical system at the wastewater treatment plant as well as replacement of the existing generator. Engineer is completing the review of the operation and maintenance manuals.
South Pump Station Generator
Project includes replacement of existing diesel generator at the South Pump Station with a natural gas generator. Engineer is completing the review of the operation and maintenance manuals. Engineer is awaiting a letter from the generator manufacturer requesting acceptance of the installed generator.
Storm Sewer Outfall Rehabilitation
Project includes repair and/or replacement of many storm sewer outfalls throughout the District based on inspections. Contractor has completed all removal and replacement work. Contractor has begun work for slope paving and recoating for pipes. Contractor anticipated project completion for the beginning of August.
Waterline Rehabilitation — Phase Two
Project includes replacement of aging waterline infrastructure within Plantation, Section One with additional location of Mayweather Lane between Plantation Drive and Morton League Road. Engineer is completing submittal review and will issue Notice to Proceed the first week of July 2025.
Club Facilities Tennis Court Improvements
The Board has approved the solicitation of the following projects that were proposed to the Board at the previous meeting. Engineer is coordinating with a Landscape Architect for the following project:
Tennis Court Rehabilitation
Contractor has completed resurfacing of courts 1, 2, 3. Contractor has begun resurfacing of Tennis Courts 4, 5, 6 which include additional pickleball courts. Contractor has requested Pay Requested No.1 for the complete resurfacing of the first three tennis courts.
Tennis Court Lighting and Electrical Improvements
Contractor completed removal of the existing lighting. Contractor has begun the installation of footing for the proposed lighting. Contractor has requested Change Order No.1 for $6,323.90 to add arm extenders to six light poles to account for the relocation of the footings due to the Contractor encountering an underground conduit.
Recoating of Hydropneumatic Tanks (HPTs) at Water Plant No. 1
Project includes re-coatings for the interior and exterior of the two (2) hydropneumatics tanks at Water Plant No. 1, including minor rehabilitation and replacement of interior components that may have deteriorated. Engineer is waiting for attorney review to execute contract.
Admin Building HVAC Investigation
Project includes plumbing repairs and HVAC removal and replacement with Polk Mechanical Services and Mercury Control Inc. Polk Mechanical Services has completed faucet installation. Odyssey is coordinating additional faucet repairs with Polk Mechanical Services. Mercury Control has completed HVAC system replacement and is currently repairing floor damage due to HVAC replacement.
Projects Under Design
WWTP Belt Press Replacement
Project includes design to update the belt press and corresponding electrical components at the WWTP. Engineer is working on final design and plan production with the following project schedule:
Complete Design — 2nd quarter of 2025.
Bid Opening — September 2025.
NTP — October 2025.
Construction Completion — March 2026
Lift Station Generator Installation
Project to include installation of three natural gas generators and not to include any improvements to CenterPoint facilities that may be required. The proposed project schedule is as follows:
Complete Design Date: June 2025.
Bid Opening: October 2025.
Notice to Proceed: December 2025.
Engineer is addressing comments to plans from Operator.
Additional Engineering Items
Surface Water Treatment Plant
Contractor has completed the installation of the replacement filter membrane. The membranes are fully operational and accepted by the District.
PILOT Agreement for Esteem AI Ventures for 4.4 Acres on Brandt Road
Developer has resubmitted plans for Mason Crossing Phase 1 for Engineer review. Engineer presented a proposed layout for the sanitary sewer and waterline extension for the utility extension along Brandt Road. Engineer estimates a total construction and engineering design cost for $350,000.00 for the project. Board Authorized Engineer to complete design for utility extension along Brandt Road.
MS4 General Permit
Si Environmental has issued a notice and letter to the resident located at 2326 Windmill Drive who has been discharging chlorinated water into the drainage channel which has caused significant damages.