PGMUD Weather Update

The District’s Operator (EDP) and Engineer (Odyssey) are monitoring the current and projected Brazos River levels.

The river is projected to reach an elevation of 42.5’ around Sunday, June 6th which puts the District into readiness Level 3. Per the District’s EAP (Emergency Action Plan), the south pump station gates should close at Brazos River elevation 40.0′. The next critical EAP elevation would be 43.56′ Brazos River gage elevation which would indicate the Pecan Lakes pump station lead pump turns on.

Please continue to check the website for updates.