Highlights of Pecan Grove MUD Meeting – February 25, 2025

The regular monthly meeting of the Pecan Grove Municipal Utility District was held at the Pecan Grove MUD Administration Building at 5:30 p.m. on February 25, 2025. The next regular meeting is scheduled for Tuesday, March 25, 2025, in the PGMUD Community/Administration building at noon.


Precinct One Constable Report


PGVFD Report — January 2025


Parks and Facilities Report

Key card readers have been installed at the pool, fitness center, and tennis courts. Use of these cards is planned to begin March 10. See Engineers Report for news on project plans for these areas. Terry Landscaping has started site work around the fitness center.


The Club at Pecan Grove

Ralph Shelbourne reported on projects and changes at The Club at Pecan Grove. This summer, The Grove and Plantation golf courses will be rebuilt — one nine at a time. Work has started on repairs to the irrigation system.

In the club building, renovation of the dining area continues. In the temporary restaurant upstairs, the club will be adding some brunches. Marketing to the public is planned to begin in March. Repair work to the wall around the lake in front of the building is being planned. The front doors to the club are going to be replaced.


Operator Report — Si Environmental, LLC

Water Accountability

  • Percent Accountability: 90.7%
  • Surface Water Treatment Plant (SWTP) Capacity: 83.2%
  • Total Metered Water: 42,775,000
  • Amount Produced:
    • SW: 37.296M
    • Ground: 12.304M
    • Total: 47,143,000
  • Amount Unaccounted for: 6,570,000
  • Amount Used for Maintenance, Est.: 1,940,000
  • Amount Used Due to Known Leaks, Est.: 1,290,000
  • Adjusted Accountability: 97.6%

January 2025 testing showed that the drinking water and wastewater systems met the state and federal compliance standards for disinfection, and there were no permit excursions for the month.

The repairs of the SWTP raw pumps #1 and #2 plus the #1 motor are in process. Replacement of the #2 sludge pump is in process. The replacement of the skid C pump and motor is in process. The replacement of the sludge pump #2 is in process.

New surge protection for Water Plant #2 is in process, as is the replacement of the check valves #3 and #4. The repair at Lift Station #9 on the #1 motor is in process. Repair of the levee sluice valve on the emergency interconnect with Harvest Green is in process.

The repairs to the district’s fire hydrants are in process, as is the painting of all 412 hydrants. The blue dots that need replacement are being addressed.

The repair of the altitude valve at the elevated storage tank is in process.

New key card access to some of the district’s facilities, plus new cameras, is complete.

Si Enviro was authorized to replace the Solar Bee tank mixer at the elevated storage tank. Recommended preventative maintenance on the jet machine was authorized.

The annual performance testing on the district’s water wells was completed with no problems noted.

Old water meters continue to be replaced, with 27 replaced in February for a total of 1,696 replaced to date.

Residents are urged to call Si Enviro first if there is an outside water leak.


TAXES

Tax collections for fiscal 2025 have reached 73.56% as of 1/31/2025.


Click here to view Projects Under Construction and Design.